Junior Warden, Annual Report, 2019
               Johnny Davis


                   •  In March the Vestry voted to do repairs to the Nursery building.  New windows were
                       ordered from Window World in Fredericksburg to be installed after the roof was
                       repaired or replaced.  Two members of the church agreed to cover the cost of a new
                       metal roof rather than paint and repair the old one.  Burrus Roofing of King George
                       was hired to do the work at a cost of $6,450. Rob Dobson agreed to oversee the

                       repairs inside and out so that windows can be installed. The roof is now complete
                       and additional repairs will be made soon.
                   •  Chris Fisher showed everyone the new AED purchased by the vestry and explained
                       how it works.  He will give an actual demonstration later.
                   •  The Pitts Brothers were called about the leak on the inside of the rear left wall of the
                       church.  They will come and assess the problem.
                   •  The termite company was called to check the buildings.  Some Powder Post Beetle
                       damage was found.
                   •  A Clean Up Day was held in March. The following things were accomplished:
                          o  First the chain link fence and white board fence were power washed by the
                              Junior Warden before the work day.
                          o  Both the chain link and the white board fences were painted.
                          o  The  whole  Parish  House  basement  was  cleaned  out    removing  trash  and
                              plastic bags from the basement.
                          o  Topsoil was spread in holes around the church yard.
                          o  The rotten stump on the fence line was dug up and removed.
                          o  All items collected outside  of the  Bell  Tower were  removed and the  items
                              inside were rearranged.
                          o  Gravel was added to the driveway to the Parish House.
                   •  Later  the  tombstones  in  the  graveyard  and  all  the  steps  to  the  buildings  were
                       power-washed by the Junior Warden and the new wind-chime donated by Catherine
                       was hung.
                   •  Tools were bought from Sears and donated to the church by the Junior Warden to be
                       kept  in the  Parish House. He immediately tested them by hanging a new bulletin
                       board purchased for the Parish House and a picture donated to the Sacristy. Then
                       new screws were used to secure hymn book holders in the sanctuary.

                   •  After  a  bad  storm  in  May,  the  Junior  Warden  cleaned  the  church  yard  removing
                       sticks and limbs.  Earlier three truck-loads of wood was removed from a fallen tree
                       on the property line with the help of Ed Harper.  Robert Bryan sawed the tree and
                       allowed us to  put it in his burn pile nearby.
                   •  In November Jeremy Pitts was hired to removed leaves and cut the riverbank.